Background and challenge
The Fassa Bortolo Group has its roots in lime processing, with a first documented activity dating back to 1710. Today it produces mortars, premixed plasters, paints, installation materials, thermal insulation solutions and the Gypsotech® plasterboard system. In 2026 it started up its second plasterboard production plant, run by Fassa Hispania S.A.U., in Tarancón, in Castilla-La Mancha.
For the new site, Modulblok designed the storage areas for two families of materials with different requirements: palletised units of up to 1,500 kg, to be stored indoors at maximum density without giving up direct access to every pallet, and long materials, to be handled outdoors, sheltered from the weather.
Both installations were to occupy half of the available area, leaving the other half ready for expansion without any work on the section already in operation.
Main objectives
- Storing heavy load units at maximum density, with direct access to every pallet
- Organising outdoor storage of long materials, protected from the weather
- Providing the capacity required from the start-up of the new plant
- Planning a phased expansion from the outset
Constraints and technical requirements
- Pallets of up to 1,500 kg and 600 kg arms
- Two families of materials with different storage requirements
- Storage of long materials in an outdoor area
- Each installation occupying half of the available area
- Future expansion with no structural work on the section in operation

Our solution
Key features
1. High-density pallet racking on mobile bases
- In the indoor warehouse, Modulblok installed 8 double-sided mobile bases of 9 bays each and 2 fixed single-sided runs, ground + 4 levels. The bases travel on rails and close up against one another, opening a single working aisle exactly where picking or put-away is needed.
- The space that fixed pallet racking would give over to aisles becomes storage area: 2,425 pallet positions in half of the warehouse, with direct access to every load unit.
2. Structure sized for heavy loads
- Bays of 3,306 mm take pallets of up to 1,500 kg, with wire mesh decks on every load level providing continuous support under the load units.
- Mesh decking laid on the frame of the mobile bases completes the support surface at ground level: the bases work as a single structure for heavy loads, from ground level to the top level.

3. Covered outdoor cantilever racking for long materials
- Outdoors, one single-sided run and one double-sided run, each with 32 columns at 1,600 mm centres and a length of about 51 m, flank a central service aisle. The reduced column spacing multiplies the support points along the bundles of material.
- 600 kg arms on base + 5 levels, with a roof on top: 900 linear metres of storage protected from the weather.

4. Installations built for growth
- Both installations currently occupy half of the available area, with the other half ready for the second phase.
- In the indoor warehouse, the mobile base rails are already laid in the unequipped half as well: expansion will only require the new bases to be installed, with no work on the flooring of the section in operation.

Technical data
| Item | Pallet racking warehouse on mobile bases | Outdoor cantilever racking |
|---|---|---|
| Site | Tarancón (Castilla-La Mancha, Spain) | Tarancón (Castilla-La Mancha, Spain) |
| Type | Pallet racking on mobile bases for heavy loads | Covered cantilever racking for outdoor use |
| Configuration | 8 double-sided mobile bases of 9 bays + 2 fixed single-sided runs of 9 bays | 1 single-sided run + 1 double-sided run of 32 columns |
| Bays / column spacing | Bays of 3,306 mm | Column spacing 1,600 mm, runs of about 51 m |
| Levels | Ground + 4 levels | Base + 5 levels + roof |
| Load capacity | Pallets of up to 1,500 kg | 600 kg per arm |
| Storage capacity | 2,425 pallet positions | 900 linear metres |
| Key features | Wire mesh decks on all levels, mesh decking on the mobile bases, rails already laid in the expansion area | Roof protecting the long materials, area prepared for doubling |

Benefits achieved
Capacity concentrated in half the area
The mobile bases reduce the working aisles to a single one: 2,425 pallet positions on half of the available floor area, with the other half free for the plant’s growth.
Heavy loads handled safely
Pallets of up to 1,500 kg on ground + 4 levels, with wire mesh decks on every load level and mesh decking on the mobile bases for continuous support.
Long materials organised outdoors
The covered cantilever racking provides 900 linear metres across two runs of about 51 m, with the materials protected from the weather and served by a central aisle.
Phased growth already planned
Both installations are ready for expansion: in the indoor warehouse the rails are already laid, and the second phase will require no work on the section in operation.
Gallery
Browse the gallery to see the project in its different phases and operating configurations.
Explore our other projects
Warehouse Engineering is the Modulblok magazine dedicated to the industrial culture of contemporary intralogistics — an editorial space created to read and interpret the changes now reshaping warehouse systems. Through technical content, scenario analysis and expert contributions, the magazine examines the technologies, operating models and skills that are redefining the role of logistics in industrial and distribution processes. The aim is to offer a structured way of reading these developments, one that connects technological change with the design of the systems themselves.
Request a technical consultation
Describe your needs: our technical team will analyze the information to understand the operational context and provide you with feedback as quickly as possible.